Project References

Northwest Redwater Project (NWR) - Safety was the top priority when the world's most modern oil sand refinery with a daily capacity of 150,000 barrels (2.5 million litres) on a 2 km² facility was built in Edmonton, Canada.

Northwest Redwater Project (NWR), Edmonton, Canada

more information (Group Website)

Eemshaven Power Plant, Netherlands

Eemshaven Power Plant, Eemshaven, Netherlands

more information (Group Website)

Chevron Phillips Cedar Bayou Ethane Cracker, Baytown, USA: PERI’s Integrated Scaffold Program (ISP) was a key factor in selecting PERI UP Rosett Flex Industrial Scaffolding to provide temporary support and access for this $5 billion EPC expansion project.

Chevron Phillips Cedar Bayou Ethane Cracker, Baytown, USA

more information (PERI USA)

Loukov Underground Fuel Tanks, Loukov, Czech Republic - The versatility of PERI UP Flex has been a key asset when building circular structures such as the underground fuel tanks in Loukov.

Loukov Underground Fuel Tanks, Loukov, Czech Republic

Airbus A350 XWB Test Stand, Erding, Germany - The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.

Airbus A350 XWB Test Stand, Erding, Germany

more information (Group Website)

Kozienice Power Plant, Poland

Kozienice Power Plant, Kozienice, Poland

more information (Group Website)

ThyssenKrupp Dedusting System for Blast Furnace 9, Duisburg, Germany. 
ThyssenKrupp Steel Europe operates a total of four own blast furnaces at its site in Duisburg, Germany. During this refurbishment, the dedusting system of the casthouse received new insulation.

ThyssenKrupp Dedusting System for Blast Furnace 9, Duisburg, Germany

more information (Group Website)

Pipeline Installation InfraLeuna GmbH, Leuna, Germany - During the construction of the 1.8 kilometer long pipeline the industrial scaffold system PERI UP Flex proved to be suitable for every structure without creating collisions.

Pipeline Installation InfraLeuna GmbH, Leuna, Germany

more information (PERI Germany)

Western Shipyard, Klaipėda, Lithuania

Western Shipyard, Klaipėda, Lithuania

Biocel Facility, Pascov, Czech Republic - At the Biocel facility a unique access solution was realized with standard components while built in safety features minimizing risk of injury on site.

Biocel Facility, Pascov, Czech Republic

more information (PERI Czech Republic)

Refineria Petronor Muskiz, Vizcaya, Spain: In complex maintenance projects PERI industrial scaffolding solutions offer safe and flexible access to all structures on industrial plants, such as at the refinery Petronor Muskiz in Spain.

Refineria Petronor Muskiz, Vizcaya, Spain

Offshore Platform RIG 140, Las Palmas, Spain: PERI UP Flex proves to be a suitable solutions for all oil and gas projects, onshore and offshore, as it provides access even in challenging conditions like at the Offshore Platform RIG 140 in Las Palmas.

Offshore Platform RIG 140, Las Palmas, Spain